IRF3710STRLPBF Hakkında

Picture of MOSFET IRF3710 N-Ch 100V 57A (Tc) TO-262-3 Long Leads, I²Pak, TO-262AA Tube Infineon
* Picture is displayed for introductory purpose. There might be differences with the original product
Araçlar
  • Ürün Fiyatı
  • Ürün Özellikleri
Ürün Özellikleri Listesi
Product Features Özellik İçeriği
Manufacturer Infineon Technologies
Series HEXFET®
Part Status Obsolete
Technology MOSFET (Metal Oxide)
FET Type N-Channel
Drain to Source Voltage (Vdss) 100V
Current - Continuous Drain (Id) @ 25°C 57A (Tc)
Power Dissipation (Max) 200W (Tc)
Rds On (Max) @ Id, Vgs 23 mOhm @ 28A, 10V
Vgs (Max) ±20V
Drive Voltage (Max Rds On, Min Rds On) 10V
Vgs(th) (Max) @ Id 4V @ 250µA
Gate Charge (Qg) (Max) @ Vgs 130nC @ 10V
Input Capacitance (Ciss) (Max) @ Vds 3130pF @ 25V
Operating Temperature -55°C ~ 175°C (TJ)
Mounting Type Through Hole
Package / Case TO-262-3 Long Leads, I²Pak, TO-262AA
Packaging Tube
Supplier Device Package TO-262
Filter

Total Stock : 00 Quantity

Quantity

  • * 25 pieces and multiples
  • * Minimum order quantity 25 pieces
-
+

Total: $0.00

pieces were calculated


Stock: 00 Quantity

Price: $7.3982

Same day + free shipment *

  • Aynı gün kargo stok ürünler için geçerlidir.
  • Ücretsiz kargo sepet tutarı KDV hariç 45 Usd ve üstü için geçerlidir.